Mathematical modelling of the scheduling of a production line at SKF
Sammanfattning
The main purpose of this thesis project is to nd the required sizes of the bu ers in one of the
future roller production channels in SKFs factory in Gothenburg. An integer linear programming
model for nding the best schedule for the channel is developed. The model minimizes sum of
the lead times for the batches of rollers in the channel. Thereby, the total time that the rollers
are kept in the bu ers is minimized, which in turn minimizes the average demand for the volumes
of the bu ers. Since the mathematical model is time-indexed, it represents an approximation of
the real scheduling problem. Therefore, post-processing is used to improve the solution obtained.
We study a case from the channel at SKF and present results in the form of optimal production
schedules and number of pallets of rollers in the bu ers during the planning period. A comparison
is made between optimal schedules obtained from the time-indexed model with di erent time step
intervals.
Examinationsnivå
Student essay
Samlingar
Fil(er)
Datum
2012-11-28Författare
Faizrahnemoon, Mahsa
Nyckelord
Production Scheduling
Integer Linear Programming
Heuristic
Optimization Modelling 1
Språk
eng