Planseparerad spårtrafik i Göteborg
Sammanfattning
The City of Gothenburg has an urgent need to upgrade its public transport. The capacity of its light rail transit (LRT) has reached maximum capacity within the inner city limits years ago. The construction of an underground metro will be very expensive and time consuming due to the soft clay beneath the city. The apparent need of developing another type of mass rapid transit (MRT) is urgent. An elevated metro have turned out to be a success in Greater Vancouver, but is it possible for the system to operate well in Gothenburg with its narrow streets and current land use; will its route coexist with the current LRT or will the noise disturb people too much?
Examinationsnivå
Student Essay
Fil(er)
Datum
2012-12-03Författare
Johansson, Rasmus
Serie/rapportnr.
Kandidatuppsats i kulturgeografi samt geografi med kulturgeografisk inriktning
2012:27
Språk
swe